Good Shepherd Medical Center – OR AHU

Good Shepherd Medical Center – OR AHU

Problem: OR 10-14 and Mechanical Room 1002 AHU-1 Due to its age, condition and lack of serviceability, the existing air handling unit (AHU-1) serving the surgical suites 10-14 at Good Shepherd Medical Center in Longview, Texas is being replaced with a new AHU. The existing AHU is located in a mechanical room on the ground […]

Read more
St. Landry Homestead Federal Savings Bank

St. Landry Homestead Federal Savings Bank

Problem: St. Landry Homestead’s main location is located in Opelousas, Louisiana. It was in need of three new rooftop units. Because it is a main bank in the area, the work needed to be done in a timely manner, without disruption of daily activities or having to close the drive thru.   Solution: Storer Services […]

Read more
First United Methodist Church

First United Methodist Church

First United Methodist Church Shreveport, LA     Existing Situation   FUMC was experiencing black stains and smudging around the diffuser grilles in the Sanctuary. The stains were unsightly and difficult to clean due to the height of the sanctuary ceilings. The church had cleaned the ceilings approximately two years prior, at significant cost; only […]

Read more
Eastman Chemical Building 2 Kitchen

Eastman Chemical Building 2 Kitchen

Problem: Eastman Chemical received many complaints about the temperature in the kitchen and dining hall. During peak summer months the temperatures where reaching 90° F and during the winter months it was extremely cold. Storer determined the issue was inadequate amounts of outside air provided to the space. All of the exterior doors were bringing [...]
Read more
Centenary’s Library Central Plant

Centenary’s Library Central Plant

Problem: Centenary College has a centralized chilled water/ hot water plant, located under the Library, which serves five campus buildings: the Library, Mickle Hall, Hurley Music Building, Smith Kilpatrick Auditorium and the Chapel. The original plant equipment consisted of an old fire tube boiler and carrier screw chiller that were at the end of their [...]
Read more
UT Health Science Center

UT Health Science Center

Problem: Storer Services was contacted by UT Health Science Center when a 16-foot, large sump condenser water pump failed. This water pump supplied condenser water to the main 900-ton York chiller of the facility. Because it supplied to the main chiller, the job needed to be started as soon as possible and completed as quickly [...]
Read more
GSMC – Central Plant

GSMC – Central Plant

The Problem: Good Shepherd Medical Center was in need of an upgrade to their central chilled water plant. The original plant was a 2600 ton primary/secondary system consisting of one large McQuay Chiller and two smaller “swing” chillers, all of which had exceeded their useful life. The plant also was utilizing a dated Johnson Control […]

Read more
Northpark Apartments

Northpark Apartments

The Problem: Northpark Apartments had (2) 20 year old air cooled chillers that had been neglected on annual service over the years.  Each chiller was becoming inefficient and not able to meet the desired capacity of the facility.  The piping configuration was a 2 pipe system so the changeover from the seasons involved manually changing […]

Read more
Shreve Memorial Library

Shreve Memorial Library

Problem:  On July 22, 2014 Storer Services was contacted by the Shreve Memorial Library to evaluate the Heating, Ventilation, and Air Conditioning (HVAC) system of Shreve Memorial Library.  Our findings showed, the existing HVAC system was providing a discharge air of 65°F at 70% relative humidity. This created an environment conducive to microbiological growth in […]

Read more
BAFB Exchange

BAFB Exchange

Description – The Base Exchange at Barksdale Air Force Base was conditioned by (25) DX Rooftop units that were approximately 10-20 years old.  The units were becoming inefficient and expensive to maintain.  Each year operating costs for the rooftop units were increasing.  In 2015 maintenance costs exceeded $ 40,000 for the rooftop units. Solution – […]

Read more