Problem: Centenary College has a centralized chilled water/ hot water plant, located under the Library, which serves five campus buildings: the Library, Mickle Hall, Hurley Music Building, Smith Kilpatrick Auditorium and the Chapel. The original plant equipment consisted of an old fire tube boiler and carrier screw chiller that were at the end of their [...]
Problem: Storer Services was contacted by UT Health Science Center when a 16-foot, large sump condenser water pump failed. This water pump supplied condenser water to the main 900-ton York chiller of the facility. Because it supplied to the main chiller, the job needed to be started as soon as possible and completed as quickly [...]
The Problem: Good Shepherd Medical Center was in need of an upgrade to their central chilled water plant. The original plant was a 2600 ton primary/secondary system consisting of one large McQuay Chiller and two smaller “swing” chillers, all of which had exceeded their useful life. The plant also was utilizing a dated Johnson Control […]
The Problem: Northpark Apartments had (2) 20 year old air cooled chillers that had been neglected on annual service over the years. Each chiller was becoming inefficient and not able to meet the desired capacity of the facility. The piping configuration was a 2 pipe system so the changeover from the seasons involved manually changing […]
Problem: On July 22, 2014 Storer Services was contacted by the Shreve Memorial Library to evaluate the Heating, Ventilation, and Air Conditioning (HVAC) system of Shreve Memorial Library. Our findings showed, the existing HVAC system was providing a discharge air of 65°F at 70% relative humidity. This created an environment conducive to microbiological growth in […]
Description – The Base Exchange at Barksdale Air Force Base was conditioned by (25) DX Rooftop units that were approximately 10-20 years old. The units were becoming inefficient and expensive to maintain. Each year operating costs for the rooftop units were increasing. In 2015 maintenance costs exceeded $ 40,000 for the rooftop units. Solution – […]
Storer Services was contracted to upgrade the control system at fifteen of the buildings including the Gold Dome, Fitness Center, Mickle Hall and more. There were many different brands of controls being utilized with no common graphical user interface making it very hard to use. Some of these existing controls were reused while many were […]
New Control System and Integration for a 270,000 square foot Multi-purpose Arena Storer Services was contracted to upgrade the control system at the arena. This contract included installing all new communication wiring, sensors and a new graphical user interface. New controllers were installed on all air handling units, centrifugal chiller and boiler plants while integrating […]