Cane River Brewery

PROBLEM 

Cane River Brewery requires a reliable mechanical contractor to design and install a steam boiler system to support their brewing process tanks. The facility was under construction and on a tight timeline to be fully operational for a planned January 2019 opening. 

 

SOLUTION 

Storer Services installed and commissioned a 1,000,000 BTU/hr Rite steam boiler system, including a blowdown tank, digital steam trap valves, and over 200 feet of process piping. 

The system was designed and installed to meet the brewery’s production requirements while ensuring safe, efficient, and reliable steam delivery to process equipment. The full installation and commissioning were completed in approximately three weeks. 

 

LEGACY 

Cane River Brewery successfully opened on January 31, 2019 with a fully operational steam system supporting their production process. 

Storer Services continues to provide quarterly service and inspections to ensure long-term reliability, safe operation, and consistent performance of the boiler system, supporting ongoing brewery operations. 