Owner: MORRIS & DICKSON Year: 2016 – Present Services Purchased – New Niagara N4 Control System – Measurement and Verification System – Preventive Maintenance Agreement on all HVAC Equipment – Connected Building Services Agreement for Controls and M&V Systems Problem: Morris and Dickson (M&D) were expanding their existing warehouse space. The expansion plan included […]
The Problem: Good Shepherd Medical Center was in need of an upgrade to their central chilled water plant. The original plant was a 2600 ton primary/secondary system consisting of one large McQuay Chiller and two smaller “swing” chillers, all of which had exceeded their useful life. The plant also was utilizing a dated Johnson Control […]
Storer Services was contracted to provide HVAC controls for the Bossier Civic Center and the City Municipal Complex. The Civic Center was selected to be the first building to receive controls because it was the single highest energy consumer within the City of Bossier. The facility houses 3 chillers that serve all of the city […]
Storer Services was contracted to upgrade the control system at fifteen of the buildings including the Gold Dome, Fitness Center, Mickle Hall and more. There were many different brands of controls being utilized with no common graphical user interface making it very hard to use. Some of these existing controls were reused while many were […]