About Project

Storer Services was contracted by the Caddo Parish School Board (CPSB) to furnish and install controls for both Northwood High School (NWHS) and North Caddo High School (NCHS). Both of these projects were completed within the 3 month timeframe allotted during the school’s summer break. CPSB had unique specific request for this project. It was required for all units to have the control wiring installed in conduit. An additional stipulation was for us to clean all of the units and change all filters before the project began and after the project was complete. Since Storer has a full service department, along with being a parts distributer, we were easily able to meet this requirement.

Storer has since been contracted to install supervisory control of 4 schools. This will require working closely with the CPSB IT department to install software on their server. A server has been dedicated to this project for Storer to integrate other schools that currently have JCI, ASI controls and Schneider controls. Storer will integrate their existing systems to interface with one seamless site for facility project team and school officials to maintain.

Storer Services entered into a Client Services Agreement with preventive maintenance in January of 2015. From then until September of 2015 we have saved in excess of $60,000.