Project Overview Client: Local High School Location: Storer High Issue: Persistent clogging and backing up of floor sinks and floor drains Scope: Camera all grease waste lines and identify problem areas, Jet all horizontal lines, camera when complete Background A local high school cafeteria on the South end of town is experiencing and having recurring […]
Problem: Chillers represent a substantial capital investment and are a significant contributor to operating costs in institutional and commercial facilities. Bossier Parish Community College relies on its comprehensive preventive maintenance agreement with Storer Services to diagnose problems in advance. During our annual stop inspection of their 17-year-old chillers, our technicians noticed the tube sheets were […]
NTCC has been focused on maintaining their HVAC equipment so they get the maximum up-time, efficiency, and maximum life span. To accomplish this, we have invested a significant amount of money into the proper repair of broken equipment, scheduling the conditioning of spaces to align with their usage and the proper preventative maintenance. One of [...]
Problem: Centenary College has a centralized chilled water/ hot water plant, located under the Library, which serves five campus buildings: the Library, Mickle Hall, Hurley Music Building, Smith Kilpatrick Auditorium and the Chapel. The original plant equipment consisted of an old fire tube boiler and carrier screw chiller that were at the end of their [...]
Problem: Caddo Parish School Board contacted Storer Services in the fall of 2016 to perform a Stop Inspection on a 1984 Cleaver Brooks boiler. During this inspection we discovered that the inner door was in need of repair due to age and wear. We also found that a 3-way chilled water control valve was not [...]
Problem: Storer Services was contacted by UT Health Science Center when a 16-foot, large sump condenser water pump failed. This water pump supplied condenser water to the main 900-ton York chiller of the facility. Because it supplied to the main chiller, the job needed to be started as soon as possible and completed as quickly [...]
Storer On-Site Building Services Contract: December 2004-Current. Storer Services has also been under a Client Services agreement with Bossier Parish Community College since the campus was opened in 2004. Storer has been able to provide full on-site maintenance, energy management and measurement and verification of energy. Storer identifies ways to conserve energy along with providing […]
Storer Services was contracted by the Caddo Parish School Board (CPSB) to furnish and install controls for both Northwood High School (NWHS) and North Caddo High School (NCHS). Both of these projects were completed within the 3 month timeframe allotted during the school’s summer break. CPSB had unique specific request for this project. It was […]
Storer Services was contracted to upgrade the control system at fifteen of the buildings including the Gold Dome, Fitness Center, Mickle Hall and more. There were many different brands of controls being utilized with no common graphical user interface making it very hard to use. Some of these existing controls were reused while many were […]