Problem: The Hertz Investment Group contracted Storer Services in February of 2016 to perform a complete overhaul (CPR) on a 1981 Trane centrifugal “Sidewinder” chiller located in the Capital One building in Lake Charles, LA.  The age of the machine and the obsolete design made this project particularly challenging as many of the required parts [...]
Read more
Caddo Parish School Board

Caddo Parish School Board

Problem: Caddo Parish School Board contacted Storer Services in the fall of 2016 to perform a Stop Inspection on a 1984 Cleaver Brooks boiler. During this inspection we discovered that the inner door was in need of repair due to age and wear. We also found that a 3-way chilled water control valve was not [...]
Read more
Regions Tower

Regions Tower

Problem: 1973 PCV (sidewinder) Trane chiller motor failed.  Upon disassembly, we discovered excessive end-play had allowed the 1st-stage impeller to rub against the diaphragm plate and the back of the impeller was extremely thin. Solution: We removed the motor and sent it off for repair/refurbishment. A replacement  impeller was not available since the unit was over […]

Read more
BPCC

BPCC

Storer On-Site Building Services Contract:   December 2004-Current. The BPCC Storer Services has also been under a Client Services agreement with Bossier Parish Community College sense the campus was opened in 2004. Storer has been able to provide full onsite maintenance, energy management and measurement and verification of energy. Storer identifies ways to conserve energy along […]