Morris & Dickson

Morris & Dickson

Owner: MORRIS & DICKSON Year: 2016 – Present Services Purchased – New Niagara N4 Control System – Measurement and Verification System – Preventive Maintenance Agreement on all HVAC Equipment – Client Services Agreement for Controls and M&V Systems   Problem: Morris and Dickson (M&D) were expanding their existing warehouse space.  The expansion plan included adding […]

Read more
Centenary’s Library Central Plant

Centenary’s Library Central Plant

Problem: Centenary College has a centralized chilled water/ hot water plant, located under the Library, which serves five campus buildings: the Library, Mickle Hall, Hurley Music Building, Smith Kilpatrick Auditorium and the Chapel. The original plant equipment consisted of an old fire tube boiler and carrier screw chiller that were at the end of their [...]
Read more
GSMC – Central Plant

GSMC – Central Plant

The Problem: Good Shepherd Medical Center was in need of an upgrade to their central chilled water plant. The original plant was a 2600 ton primary/secondary system consisting of one large McQuay Chiller and two smaller “swing” chillers, all of which had exceeded their useful life. The plant also was utilizing a dated Johnson Control […]

Read more
Shreve Memorial Library

Shreve Memorial Library

Problem:  On July 22, 2014 Storer Services was contacted by the Shreve Memorial Library to evaluate the Heating, Ventilation, and Air Conditioning (HVAC) system of Shreve Memorial Library.  Our findings showed, the existing HVAC system was providing a discharge air of 65°F at 70% relative humidity. This created an environment conducive to microbiological growth in […]

Read more
Bossier City Civic Center

Bossier City Civic Center

Storer Services was contracted to provide HVAC controls for the Bossier Civic Center and the City Municipal Complex. The Civic Center was selected to be the first building to receive controls because it was the single highest energy consumer within the City of Bossier. The facility houses 3 chillers that serve all of the city […]

Read more
Caddo Parish School Board

Caddo Parish School Board

Storer Services was contracted by the Caddo Parish School Board (CPSB) to furnish and install controls for both Northwood High School (NWHS) and North Caddo High School (NCHS). Both of these projects were completed within the 3 month timeframe allotted during the school’s summer break. CPSB had unique specific request for this project. It was […]

Read more
Centenary College

Centenary College

Storer Services was contracted to upgrade the control system at fifteen of the buildings including the Gold Dome, Fitness Center, Mickle Hall and more. There were many different brands of controls being utilized with no common graphical user interface making it very hard to use. Some of these existing controls were reused while many were […]

Read more
Centurylink Center

Centurylink Center

New Control System and Integration for a 270,000 square foot Multi-purpose Arena Storer Services was contracted to upgrade the control system at the arena. This contract included installing all new communication wiring, sensors and a new graphical user interface. New controllers were installed on all air handling units, centrifugal chiller and boiler plants while integrating […]

Read more